Your current location is:Home-> Successful cases-> MAO chau river management of the gu...
Tiger pit communication changes.
One, MAO chau river management baoan section communication relocation project.
Project introduction MaoZhou for shenzhen first river, river originates in sheep taishan in shenzhen high mountain, river total length of 41.61 km, but more than sandstone reservoir of river 10.32 km, guangshen highway ~ MaoZhou river estuary (range 10.2 km long river) is the boundary between the shenzhen and dongguan. The basin area is 398.13 square kilometers (including 44 square kilometers of rock reservoir control basin), among which the area of shenzhen is 310.85 square kilometers.
MaoZhou river basin (baoan area is 113 square kilometers, including a main stream, 18 tributary, the water environment comprehensive improvement project involves rivers, sewage pipe network engineering, the six categories, a total of 46 is project, total investment estimation will amount to 15.2 billion.
The comprehensive renovation project of the water environment of the maozhou river (guangming new district) is the construction of EPC general contracting of the association of China electric construction group and the east China survey and design institute of China electric construction group. The total investment of the project is 43.7 billion yuan.
Tiger pit communication to change the taekou river communication.